top of page
slider1.jpg
AXA Govt Logo.png
AXA Logo Tourism.png

About

CLAYTON J. LLOYD INTERNATIONAL AIRPORT
REDEVELOPMENT PROGRAM

term_render_24.png

A New Era with Our Upcoming Terminal

Get ready to experience travel like never before with our new passenger terminal, set to welcome the world by mid-2025. Designed to optimize passenger flow and enhance service quality, the terminal will introduce an array of facilities and amenities tailored to meet the needs of modern travelers. From the moment you arrive until your departure, every aspect of your journey will be infused with efficiency and comfort.

7,000ft

Runway Extension and Widening

50,000 sqft

New Passenger Terminal

215

Passenger Peak Hour Capacity

for Arriving or Departing Passengers

Infrastructure for Tomorrow

Our commitment to excellence is evident in our state-of-the-art facilities. Adhering to the highest standards of ICAO Annex 14, our airport boasts a grooved runway, sophisticated airfield lighting, and a modern air traffic control tower. In addition to this, we are aiming to extend our runway to 7,000ft by 2026. These elements combine to ensure the highest levels of safety and efficiency, providing a reliable and advanced gateway for all travelers.

airfield_24.png

Global Connectivity Redefined

Our runway, adept at accommodating a diverse range of aircraft, is the backbone of our connectivity. As we look to the future, our expansion plans promise to further cement our position as a critical node in the global travel network.
 

finalGraphic.png

Visionary Expansion on the Horizon

The horizon of 2026 brings with it an ambitious expansion of our facilities. An extended and widened runway that will pave the way for an increased number of routes and destinations. This significant upgrade will not only expand our reach but also elevate the overall travel experience, making every journey more seamless and accessible.

tick.png
tick.png
tick.png
tick.png
tick.png
tick.png

ICAO Annex 14 Compliant Airfield

ASSI Regulated

Modern Safe and Capable Runway

- 4,963 x 100 ft Runway with Grooving

- Code 3C Non-Instrument

- 0.95% Runway Slope

- PCN 42 F/A/W/T Pavement

- Runway End Safety Areas


Comprehensive Airfield Lighting
Runway, Taxiway, PAPI, Wind Direction, Beacons

Modern Air Traffic Control Tower

Modern Firehall with CAT 6 ARFF

tick.png
tick.png
tick.png

New 50,000 sq ft Passenger Terminal


215 Passenger Peak Hour Capacity
for arriving or departing passengers


3 Code C Terminal Stands

up to E175/190/195, A220, B737

A Vision Supported by Global Partnerships

logos.png

The transformation of Clayton J. Lloyd International Airport into a world-class facility is propelled by generous support from the UK International Program. This redevelopment is a testament to our commitment to enhancing our capabilities and ensuring that the airport remains a key hub for international travel. Our vision extends beyond expansion; it's about creating a legacy of connectivity and service excellence for generations to come.

Project Contacts

​

Kendell O. Richardson

Government of Anguilla

Kendell.Richardson@gov.ai

+1 264-476-7669

www.gov.ai

​

​

Jabari Harrigan

Anguilla Air and Sea Ports Authority

Jabari.Harrigan@aaspa.ai

+1 264-584-9642

www.anguillaports.com

Website Management:

Avia-NG-Tagline-fordarkBG.png

© 2024 by AviaNG

bottom of page